Procurement planning reforms and road infrastructure service delivery in Kibaale District Local Government. A cross-sectional study.

Authors

  • Annette Tibasiima School of Graduate Studies and Research, Team University.
  • Dr. Sendagi Muhammad School of Graduate Studies and Research, Team University.
  • Edmand Bakashaba School of Graduate Studies and Research, Team University.

DOI:

https://doi.org/10.70572/nh41av95

Keywords:

Procurement planning reforms, Risk documentation, Road infrastructure service delivery, Kibaale District Local Government.

Abstract

Background:

Procurement planning is an important component of public procurement because it enables local governments to identify procurement requirements. The study aims to examine the relationship between procurement planning reforms and road infrastructure service delivery in Kibaale District Local Government.

 Methodology:

A cross-sectional study. The study population comprised district officials and councillors. This group comprised 180 people in Kibaale District Local Government, including key informants (the Chief Administrative Officer, Principal Procurement Officer, Chairperson LCV, District Engineer and their assistants), technical and administrative staff, procurement and finance staff, engineering and works staff, district councillors and committee members.

 Results:

Procurement planning reforms had an overall moderate implementation level (M = 3.22, SD = 0.83), the highest among the three reforms. Preparation of technical specifications before procurement received the highest rating (M = 3.51), with 50.4% agreeing, while procurement plans prepared within required periods also received positive responses (M = 3.40; 50.4%). Weaknesses were reported in specifying procurement works (M = 3.00), determining cost estimates (M = 3.02), and assessing implementation risks (M = 3.04). Qualitative and documentary findings indicated that although planning involved relevant departments, changing funding allocations, incomplete technical surveys, inadequate risk documentation, and late procurement initiation affected planning consistency. Pearson correlation revealed a positive, statistically significant relationship between procurement planning reforms and road infrastructure service delivery (r = 0.376, p < 0.001, n = 123). Most respondents were aged 30–39 years (35.0%) and 40–49 years (35.0%), followed by 50 years and above (20.3%), while only 9.8% were below 30 years.

 Conclusion:

Procurement planning contributes to improved road infrastructure service delivery when plans are technically accurate, adequately costed, risk-informed, and consistently implemented.

 Recommendations:

The Procurement and Disposal Unit should use a standard planning checklist and monitor procurement lead times monthly, so that late requisitions are identified and corrected early.

References

1. Amin, M. E. (2005). Social science research: Conception, methodology and analysis. Kampala, Uganda: Makerere University Printery.

2. Ayebesa, S. (2023). Examining public sector procurement governance for the road subsector in Uganda: A perspective of civil engineers. Makerere University.

3. Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). Sage.

4. Guest, G., Bunce, A., & Johnson, L. (2006). How many interviews are enough? An experiment with data saturation and variability. Field Methods, 18(1), 59-82.

5. https://doi.org/10.1177/1525822X05279903

6. Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610.

7. https://doi.org/10.1177/001316447003000308

8. Nduhura, A., Lukamba, T. M., & Nuwagaba, I. (2020). Governing with citizens' extended theory in the practice of procurement and public-private partnerships: A developing country's perspective in the energy sector. African Journal of Governance and Development, 9(1), 1-15.

9. Nunnally, J. C., & Bernstein, I. H. (1994). Psychometric theory (3rd ed.). McGraw-Hill.

10. Organisation for Economic Co-operation and Development. (2023). Managing risks in the public procurement of goods, services and infrastructure. OECD Publishing. https://doi.org/10.1787/45667d2f-en

11. World Bank. (2023). Uganda-Factors affecting contract management: A study on implications and factors affecting contract management in public procurement in Uganda. World Bank.

Downloads

Published

2026-11-25

Issue

Section

Section of Business and Economics

How to Cite

Tibasiima, A., Sendagi, M., & Bakashaba, E. (2026). Procurement planning reforms and road infrastructure service delivery in Kibaale District Local Government. A cross-sectional study. AfroGlobal Perspectives, 3(11), 16. https://doi.org/10.70572/nh41av95

Similar Articles

11-20 of 112

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)